MEP consultancy services
Design, surveys and technical advice for new and existing buildings, with energy assessments where required. Choose the support and outputs you need.
Design
Mechanical and public-health design, with wider building-services support agreed for each project.
Surveys
Understand selected plant, systems or a building area. Condition reports and asset records help plan maintenance, refurbishment and replacement.
Explore condition surveysCondition surveys
An agreed asset schedule, condition findings and actions for selected systems or areas.
Technical investigations
Focused investigation of heating, ventilation and comfort problems
Asset registers
An agreed spreadsheet of plant identifiers, locations and available equipment information
From condition to a practical plan
Fictional example · not a project estimate
01 / Condition
What needs attention?
8 assets in the sample register.
- Good1
- Fair3
- Poor3
- Not assessed1
Condition informs the action. Failure risk also considers the asset’s role and the effect of losing it. Uninspected items remain unassessed.
02 / Lifecycle planning
When might costs arise?
Five-year allowances · four selected assets.
- Year 1£11,190
- Year 2£790
- Year 3£790
- Year 4£3,290
- Year 5£790
- Maintenance / 5 years
- £3,950
- Replacement / 5 years
- £12,900
- Combined allowance
- £16,850
03 / Replacement
What should be allowed for?
Provisional installed allowances · selected assets.
- Heating boilerB-01 · Year 1£8,000
- Heating pumpP-01 · Year 1£1,800
- Isolation valveV-01 · Year 1£600
- Fan-coil unitFCU-01 · Year 4£2,500
Timing is an illustrative planning assumption, not a prediction of remaining life. Confirm condition, duty, access and scope before budgeting or ordering.
Illustrative allowances for four selected assets, not quotations or benchmarks. Maintenance is held constant; VAT, inflation and wider project costs are excluded. Project costs require an agreed basis and review by the appointed cost manager or quantity surveyor.
View the full survey example and assumptionsTechnical advice
Focused assessments, option comparisons and written reviews to help you decide what to do next.
Where the cost sits
Provisional MEP estimates for early decisions.
- Plant & equipmentEquipment and installation
- DistributionDuctwork and pipework
- ControlsIntegration and interfaces
- CommissioningTesting and handover
Illustrative proportions. Estimates depend on scope, assumptions and pricing basis.
Formal cost planning and management should be led by a suitably qualified cost manager or quantity surveyor.
About this example
Provisional cost-estimate information
- Element
- Plant, distribution, terminals, controls and commissioning allowances.
- Basis
- Record quantity, unit, rate source, pricing date and scope.
- Comparison
- Separate capital-cost inputs from operating and replacement assumptions.
- Qualifications
- Identify exclusions, risk allowances and information still to be confirmed.
- Responsibility
- Provisional MEP estimates support a suitably qualified cost manager or quantity surveyor, who should lead formal cost planning, budget validation and cost management.
Electrical support
Electrical requirements and interfaces, with scope agreed for each project
Design coordination
Spatial coordination, reviews and technical information
Cost estimates and option appraisal
Repair, retain or replace: technical comparisons with provisional cost estimates
Technical advice
A defined second opinion on a design, contractor proposal or technical question
Energy assessments
Thermal, energy and comfort assessments to inform design decisions.
Annual energy use Demonstration data
- Heating
- 42,000kWh42%
- Cooling
- 18,000kWh18%
- Fans & pumps
- 14,000kWh14%
- Lighting
- 16,000kWh16%
- Hot water
- 10,000kWh10%
About this example
How to read the example
- Energy boundary
- Annual delivered energy by end use, shown in kWh/year.
- Demonstration figures
- Synthetic values illustrate report presentation; they are not a benchmark or project prediction.
- Assessment inputs
- Geometry, fabric, occupancy, operating hours, systems and control assumptions.
- Carbon assessment
- Report separately using the energy-carrier split, stated emission factors and assessment year.
- Option comparison
- Compare alternatives using the same assessment boundary and operating assumptions.
Specific assessments
Energy and overheating
Assessment routes depend on the building, location and proposed works.