Typical appointments
- New dwellings and residential developments in England
- Early facade, glazing and ventilation design
- Changes to window openings, shading or internal layouts
- Coordination of passive measures and active cooling proposals
Energy and compliance
Residential overheating risk considered alongside glazing, shading, ventilation, security and energy strategy.
Service overview
Overheating design decisions affect architecture and MEP systems. MEPX can coordinate the assessment inputs with glazing, shading, openable areas, ventilation strategy and any proposed active cooling.
The aim is to identify risks while practical design options remain available and to maintain a clear assumptions and evidence trail.
Scope note Applicable assessment, evidence, lodgement and third-party responsibilities are confirmed for each commission.
Project fit
Technical scope
Common questions
Approved Document O addresses overheating risk in new residential buildings in England. The applicable assessment route depends on the building and design.
Assessment should begin while glazing, orientation, shading, ventilation openings and internal layouts can still be coordinated.
No. Passive measures and usable ventilation should be considered first. Any active cooling proposal needs to be coordinated with the wider energy and MEP strategy.
Typical inputs include geometry, orientation, glazing, shading, opening details, ventilation strategy, location and relevant occupancy assumptions.
Project discussion
Share the building type, location, design stage and available information. MEPX can identify the likely assessment scope and information needed to proceed.