Part O overheating assessment
Residential overheating risk considered alongside glazing, shading, ventilation, security and energy strategy.
Scope of the assessment
Overheating design decisions affect architecture and MEP systems. MEPX can coordinate the assessment inputs with glazing, shading, openable areas, ventilation strategy and any proposed active cooling.
The aim is to identify risks while practical design options remain available and to maintain a clear record of assumptions and evidence.
Applicable assessments, evidence and third-party responsibilities are confirmed for each commission.
Deliverables
What you receive
A clear record of the design, findings or advice. The documents and level of detail are agreed for your project.
Understand what shapes comfort
Explore the building and its environment.
- Solar gainGlazing, orientation and shading
- FabricHeat transfer through the envelope
- VentilationAirflow and operating assumptions
Assessment findings inform design options. This illustration shows no calculated result.
About this example
Typical performance outputs
- Assessment inputs
- Geometry, fabric, glazing, shading, occupancy and ventilation assumptions.
- Results
- Comfort and overheating findings, with modelling limitations recorded.
- Options
- Compare design changes on a consistent basis; no temperature or compliance result is implied by this illustration.
- Assessment scope and inputs schedule
- Overheating assessment outputs
- Risk summary and design recommendations
- Updated evidence as the design develops, where appointed
Key considerations
- Solar gain, glazing and orientation
- Shading and usable opening areas
- Purge ventilation, noise and security
- Interaction with Part L and active cooling
When to involve us
When it helps
- New dwellings and residential developments in England
- Early facade, glazing and ventilation design
- Changes to window openings, shading or internal layouts
- Coordination of passive measures and active cooling proposals
Useful information
- Plans, elevations, sections and orientation
- Window sizes, opening areas and glazing data
- External shading and surrounding context
- Ventilation, security and noise constraints
Common questions
What does Part O address?
Approved Document O addresses overheating risk in new residential buildings in England. The applicable assessment route depends on the building and design.
When should overheating be assessed?
Assessment should begin while glazing, orientation, shading, ventilation openings and internal layouts can still be coordinated.
Is air conditioning the default solution?
No. Passive measures and usable ventilation should be considered first. Any active cooling proposal needs to be coordinated with the wider energy and MEP strategy.
What information is normally required?
Typical inputs include geometry, orientation, glazing, shading, opening details, ventilation strategy, location and relevant occupancy assumptions.
Related services
Next step
Discuss your assessment
Tell us the building type, location, proposed work and information available.