Building type

Residential

MEP planning for housing and care environments.

Design priorities

What the services need to resolve

Technical profile

What needs to be coordinated

Requirements are confirmed for the specific building, project stage, procurement route and appointed design responsibilities.

Compliance and performance

  • SAP, EPC and Part L energy evidence for the applicable dwelling route
  • Part F ventilation and Part O overheating requirements where triggered
  • Part G water use, sanitary provision and Part B fire interfaces

Typical service provisions

  • Space heating, low-temperature distribution and domestic hot water
  • Whole-dwelling ventilation, local extract and comfort controls
  • Landlord and dwelling electrical distribution, lighting, data and metering
  • Water, drainage, rainwater and external utility connections

Consultant and specialist interfaces

  • Architectural layouts, fabric, airtightness, acoustics and service zones
  • Energy assessor, fire consultant, structural engineer and utility providers
  • Kitchen, bathroom, lift, sprinkler and other specialist suppliers

Fire strategy and life safety

  • Coordinate alarms, smoke control, emergency power and lift interfaces to the appointed fire strategy
  • Protect compartmentation where services cross walls, floors and shafts
  • Define sprinkler, smoke-ventilation and evacuation-system boundaries where required

The appointed fire consultant owns the fire strategy. MEP design coordinates the defined building-services interfaces.

Project discussion

Talk through this building type

Share the building use, location and decision needed. MEPX can help define the disciplines and project information needed to begin.

MEPX / Project enquiry

Short technical briefStep 1 of 7 · Project type
14%

Stage 1 of 5 · Project type

Project · type

What is the project?

Choose the closest route. You can refine the brief later.

MEPX / Compliance route