Services

Mechanical

Heating, cooling, ventilation and controls

Service scope

Mechanical systems

Mechanical design is framed around comfort, resilience and energy targets, then shaped for access, buildability and reliable operation.

Typical focus

  • Heating, cooling and ventilation strategy
  • Air handling, extraction and distribution control
  • Plant-room sizing and route coordination
  • Control logic and maintenance access planning

Deliverables

  • Design basis and option appraisal
  • Load profiles and thermal/ventilation calculations
  • Plant and controls strategy
  • Co-ordinated mechanical layouts, specifications and schedules

Key compliance context

  • Building Regulations Approved Documents L, F, O and J where relevant
  • CIBSE Guides A, B and H
  • Project-specific British Standards and manufacturer requirements
Requirements are confirmed for the location, building type and scope of each commission.

When it is needed

Project applications

Typical appointments

  • New build or major refurbishment
  • Plant replacement and decarbonisation
  • Ventilation, comfort or load-gap reviews
  • Tender response and contractor-design coordination

Information to start

  • Architectural plans and occupancy brief
  • Performance targets and environmental assumptions
  • Existing survey records and equipment data
  • Energy model, planning context and programme

Project stages

  1. Feasibility
  2. Concept
  3. Technical design
  4. Construction review

Focused mechanical route

HVAC and air-conditioning design

Common questions

Scope notes

Is ventilation included?

Yes. Air quality and thermal comfort are included within one coordinated mechanical scope.

Can we assess existing plant before replacement?

Yes. Existing records and measured performance are reviewed first, then replacement is defined by load, condition and access.

Related services

Other disciplines

MEPX / Project enquiry

Short technical briefStep 1 of 7 · Project type
14%

Stage 1 of 5 · Project type

Project · type

What is the project?

Choose the closest route. You can refine the brief later.

MEPX / Compliance route