Services

Fire and life safety

Fire-alarm performance design and life-safety system coordination

Service scope

Fire and life safety systems

MEP design is aligned to the approved fire strategy, with detection, alarm, emergency power and sprinkler interfaces managed from the outset.

Typical focus

  • Fire-alarm performance requirements and cause-and-effect logic
  • Emergency-lighting interfaces and life-safety power strategy
  • Sprinkler, smoke-control and specialist-system interfaces
  • Coordination with fire consultants, specialist contractors and the approved strategy

Deliverables

  • Coordinated MEP layouts and system-interface drawings
  • Performance requirements, cause-and-effect notes and review comments
  • Design-risk records and specialist coordination actions

Key compliance context

  • Building Regulations Approved Document B and the approved fire strategy
  • BS 5839 fire detection and alarm guidance
  • BS 5266 emergency-lighting guidance and applicable sprinkler standards
Requirements are confirmed for the location, building type and scope of each commission.

Service boundaryMEPX does not prepare the fire strategy and does not replace the appointed fire consultant.

When it is needed

Project applications

Typical appointments

  • Fire-alarm performance design is part of the commission
  • MEP design is linked to an approved fire strategy
  • Sprinkler, smoke-control or evacuation interfaces need sequencing
  • Life-safety systems are being modified or upgraded

Information to start

  • Approved fire strategy
  • Architectural fire plans
  • Specialist contractor notes
  • Existing system and cause-and-effect references

Project stages

  1. Performance requirements
  2. MEP interface design
  3. Specialist coordination
  4. Submittal review

Common questions

Scope notes

Do you prepare the fire strategy?

No. The appointed fire consultant owns the strategy. MEPX aligns the services design to that strategy.

Can sprinkler interfaces be coordinated?

Yes. We align plant, water and control interfaces to the sprinkler design and project sequence.

Related services

Other disciplines

MEPX / Project enquiry

Short technical briefStep 1 of 7 · Project type
14%

Stage 1 of 5 · Project type

Project · type

What is the project?

Choose the closest route. You can refine the brief later.

MEPX / Compliance route