Guides

Project guides

Understand the scope, information and decisions involved in building-services work. Guidance is a starting point, not a project-specific design.

What should a building-services condition survey include?

A practical guide to building-services condition reports: asset records, defects, risk priorities, maintenance actions and provisional replacement costs.

When is an SBEM assessment required?

How SBEM supports Part L compliance for non-domestic projects and where early inputs make the biggest impact.

Building-services asset registers: what to include

What to record in a building-services asset register, how to identify missing evidence, and how an asset list differs from a condition survey report.

Fire strategy and MEP design responsibilities

Where strategy ownership ends and MEP coordination responsibilities begin in multidisciplinary projects.

When should an MEP consultant be appointed?

When building-services design decisions can affect architecture, cost and programme if delayed.

MEP concept design vs technical design

How building-services information develops from system strategy and spatial allowances into coordinated construction information.

What information is needed to start MEP design?

The project, building and performance information that makes an MEP design brief reliable and reduces avoidable assumptions.

What is the difference between SAP and SBEM?

A practical distinction between residential SAP and non-domestic SBEM assessment routes and when design teams should confirm the method.

How Part L affects MEP design

Why building energy compliance depends on coordinated fabric, HVAC, lighting, controls, commissioning and evidence decisions.

MEPX / Project enquiry

Tell us what you need.

Approximate details are fine. We’ll agree the scope with you.

Help needed — choose any that apply
Systems involved — optional; choose any
Describe the building, the work or problem, and what you would like help with.