All guides

MEP concept design vs technical design

How building-services information develops from system strategy and spatial allowances into coordinated construction information.

Concept design selects the route

Concept design tests viable systems, major plant, energy implications, utility requirements and spatial allowances. It should explain why a strategy is suitable before detailed information is produced.

Spatial coordination proves it can fit

Plant rooms, risers, ceiling zones and principal routes need to be coordinated with architecture, structure and specialist systems before technical design is fixed.

Technical design defines the information

Calculations, equipment criteria, drawings, schematics, schedules, specifications and interface details develop to the level required by the procurement and responsibility route.

Responsibility still needs to be explicit

A Stage 4 label does not define who completes contractor or specialist design. The appointment should assign each output, review and interface clearly.

Apply the guidance

Next step

Discuss your project

Tell us what your project needs to resolve. We can help identify the relevant scope and information.

hello@mepx.co.uk
MEPX / Project enquiry

Tell us what you need.

Approximate details are fine. We’ll agree the scope with you.

Help needed — choose any that apply
Systems involved — optional; choose any
Describe the building, the work or problem, and what you would like help with.