All services

Part L compliance

Building energy compliance developed alongside architecture, fabric and MEP system decisions.

Scope of the assessment

Part L compliance is a coordinated design activity. Fabric performance, air permeability, heating, cooling, ventilation, lighting, controls and renewable systems need to be considered together with the required evidence.

MEPX helps define the assessment route, assumptions, information responsibilities and design actions appropriate to the project stage.

Applicable assessments, evidence and third-party responsibilities are confirmed for each commission.

Deliverables

What you receive

A clear record of the design, findings or advice. The documents and level of detail are agreed for your project.

Technical review note

Make the next decision clear

A focused technical review.

  1. 01
    Observation

    The issue and the information reviewed.

  2. 02
    Implication

    What it means for design or operation.

  3. 03
    Action

    A clear recommendation and response.

Technical review noteThe issue, its implications and the next decision.
About this example

Technical-review structure

Reference
Document, revision, location and review item.
Observation
Describe the specific issue and the information reviewed.
Implication
Explain the effect on coordination, operation or the design decision.
Action & response
Record the requested action, responsible party, response and close-out evidence.
  1. Compliance-route and responsibility review
  2. Coordinated inputs and assumptions register
  3. SAP or SBEM assessment support as applicable
  4. Design actions and evidence requirements

Key considerations

When to involve us

When it helps

  • New residential and non-domestic buildings
  • Extensions, conversions and refurbishment where applicable
  • Early energy-strategy and option decisions
  • Design changes with an energy or compliance impact

Useful information

  • Building type, location and scope of work
  • Architectural geometry and fabric specification
  • Proposed MEP systems and controls
  • Project programme and approval strategy

Common questions

Is Part L only an energy-model calculation?

No. Compliance depends on coordinated fabric, building-services, controls, commissioning and evidence requirements. The exact route depends on the building and work type.

When should Part L be considered?

It should be considered during briefing and concept design so energy targets influence fabric, plant, lighting and controls before spatial and technical decisions are fixed.

Does MEPX cover domestic and non-domestic projects?

MEPX can support residential and non-domestic design workflows. The required SAP, SBEM, certification and specialist responsibilities are confirmed for each commission.

What happens if a design is not meeting the target?

The assumptions and model can be reviewed to identify influential factors and compare practical improvement options with the wider design team.

Related services

Next step

Discuss your assessment

Tell us the building type, location, proposed work and information available.

hello@mepx.co.uk
MEPX / Project enquiry

Tell us what you need.

Approximate details are fine. We’ll agree the scope with you.

Help needed — choose any that apply
Systems involved — optional; choose any
Describe the building, the work or problem, and what you would like help with.