Part L compliance
Building energy compliance developed alongside architecture, fabric and MEP system decisions.
Scope of the assessment
Part L compliance is a coordinated design activity. Fabric performance, air permeability, heating, cooling, ventilation, lighting, controls and renewable systems need to be considered together with the required evidence.
MEPX helps define the assessment route, assumptions, information responsibilities and design actions appropriate to the project stage.
Applicable assessments, evidence and third-party responsibilities are confirmed for each commission.
Deliverables
What you receive
A clear record of the design, findings or advice. The documents and level of detail are agreed for your project.
Make the next decision clear
A focused technical review.
- 01Observation
The issue and the information reviewed.
- 02Implication
What it means for design or operation.
- 03Action
A clear recommendation and response.
About this example
Technical-review structure
- Reference
- Document, revision, location and review item.
- Observation
- Describe the specific issue and the information reviewed.
- Implication
- Explain the effect on coordination, operation or the design decision.
- Action & response
- Record the requested action, responsible party, response and close-out evidence.
- Compliance-route and responsibility review
- Coordinated inputs and assumptions register
- SAP or SBEM assessment support as applicable
- Design actions and evidence requirements
Key considerations
- Fabric and thermal-bridge performance
- System efficiencies and controls
- Commissioning and handover evidence
- Interaction with ventilation, overheating and planning targets
When to involve us
When it helps
- New residential and non-domestic buildings
- Extensions, conversions and refurbishment where applicable
- Early energy-strategy and option decisions
- Design changes with an energy or compliance impact
Useful information
- Building type, location and scope of work
- Architectural geometry and fabric specification
- Proposed MEP systems and controls
- Project programme and approval strategy
Common questions
Is Part L only an energy-model calculation?
No. Compliance depends on coordinated fabric, building-services, controls, commissioning and evidence requirements. The exact route depends on the building and work type.
When should Part L be considered?
It should be considered during briefing and concept design so energy targets influence fabric, plant, lighting and controls before spatial and technical decisions are fixed.
Does MEPX cover domestic and non-domestic projects?
MEPX can support residential and non-domestic design workflows. The required SAP, SBEM, certification and specialist responsibilities are confirmed for each commission.
What happens if a design is not meeting the target?
The assumptions and model can be reviewed to identify influential factors and compare practical improvement options with the wider design team.
Related services
Next step
Discuss your assessment
Tell us the building type, location, proposed work and information available.