Commercial and workplace
MEP services for offices and workplace estates.
Building-services considerations
MEP design for workplace buildings where comfort, control and continuity are tightly linked.
Project needs
- Thermal comfort, indoor-air quality and occupancy assumptions
- Overheating control with occupancy and operational zoning
- Lighting, power and sub-metering assumptions for live operation
- Resilience and maintenance boundaries for occupied spaces
Systems and interfaces
- Zoned heating, cooling and ventilation for changing occupancy
- Interfaces with the appointed electrical, data and security specialists
- Controls, metering and BMS integration for efficient operation
- Domestic water, drainage and staff welfare provisions
Design interfaces
Compliance considerations
- Part L assessment route, SBEM and EPC requirements where applicable
- Ventilation, indoor-air-quality and energy-control requirements
- Fire strategy, accessibility, water and sanitary-service interfaces
Design and operational interfaces
- Architectural layouts, facade strategy and ceiling coordination
- Structural openings, plant support, risers and distribution routes
- Energy assessor, fire consultant, acoustician, IT, security and facilities teams
Fire and life-safety interfaces
- Translate the appointed fire strategy into coordinated fire-alarm, emergency-lighting and smoke-control interfaces
- Define fire-damper, sprinkler, lift, controls and cause-and-effect responsibilities
- Coordinate penetrations, access and maintainability without changing fire-strategy ownership
The appointed fire consultant is responsible for the fire strategy. MEP systems must be coordinated with that strategy and the agreed design responsibilities.
Relevant services
We agree which parts of the work MEPX can support and where other specialists are needed.
Browse project experienceNext step
Discuss your project
Tell us about the building, location and support you need. We can help define the scope and next step.