Illustrative output

Sample condition survey

A spreadsheet example covering main plant, distribution and room terminals. Read across each row from the finding to the proposed action.

Scroll across for risk and remedial actions

Fictional sample · eight assets · plant, distribution and terminals
Element / descriptionConditionDefects / evidenceFailure likelihoodFailure consequenceRemedial action / verification
B-01Heating boiler
Plant room

Sole heating boiler.

Poor

Recurring lockouts; condensate connection corroded.

Basis: Visual + fault log; combustion not tested.

High

Further lockouts likely.

High

Building heating lost; no standby.

Plan replacement

Investigate faults; confirm duty and replacement need.

Check: Commissioning, controls and connections.

AHU-01Air-handling unit
Roof plant

Belt-driven office supply.

Fair

Loaded filters; worn drive belt.

Basis: Visual only; airflow not measured.

Medium

Belt failure / reduced airflow.

Medium

Office ventilation reduced or lost.

Service

Renew filters and belt; check alignment.

Check: Airflow, filter pressure drop and controls.

P-01Heating pump
Plant room

Duty circulation pump.

Poor

Seal seepage; bearing noise.

Basis: Running observation; duty not measured.

High

Leakage and wear may worsen.

High

Heating circulation lost; no standby.

Replace

Confirm duty; replace at agreed shutdown.

Check: Circulation, controls, leaks and vibration.

EF-01Extract fan
Ceiling void

Served rooms unverified.

Not assessed

No safe access; condition unverified.

Basis: Not inspected or functionally tested.

Unknown

Insufficient evidence.

Unknown

Served areas and critical duty unverified.

Inspect

Provide safe access; identify duty and test.

Check: Served rooms, airflow and defects; reassess.

D-01Supply ductwork
Ceiling void

Insulated supply branch.

Fair

Torn insulation; open joint seal.

Basis: Accessible section only; leakage not tested.

Low

Further loss of airflow.

Medium

Reduced airflow; energy loss and possible condensation.

Repair

Seal joints; reinstate insulation / vapour seal.

Check: Repair quality; airflow / leakage as needed.

V-01Isolation valve
Riser

Heating branch isolation.

Poor

Seized spindle; valve will not close.

Basis: Attempted operation unsuccessful.

Already failed

Isolation function unavailable.

Medium

No local isolation for maintenance or leaks.

Replace

Replace at agreed system shutdown.

Check: Full travel, safe isolation test and label.

FCU-01Fan-coil unit
Meeting room

Cooling terminal + drain.

Fair

Fouled coil; debris in drain tray.

Basis: Visual only; cooling / drainage not tested.

Medium

Reduced output / blocked drain.

Medium

Local discomfort; water damage if tray overflows.

Service

Clean coil, tray and drain.

Check: Drainage, fan, controls and leaks.

RAD-01Radiator
Office

Panel radiator + valve.

Good

Minor paint damage; no visible leak.

Basis: Visual only; output / valve not tested.

Low

Loss-of-output scenario.

Low

Local discomfort; a leak could have wider impact.

Maintain

Repair finish; retain routine checks.

Check: Valve response, heating output and leaks.

Fictional example. Likelihood is qualitative over 12 months, not a calculated probability. Unknown and failed functions are shown separately. Assess ratings and actions for each project.

Back to condition surveys
MEPX / Project enquiry

Tell us what you need.

Approximate details are fine. We’ll agree the scope with you.

Help needed — choose any that apply
Systems involved — optional; choose any
Describe the building, the work or problem, and what you would like help with.